Pelton P-2030
General information | |
Waterway |
Deschutes River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2030 |
FERC project name | Pelton Round Butte |
Other projects with this FERC number | |
Permit issued | 6/16/05 |
Permit expiration | 5/27/55 |
Ownership and operation | |
Owner | Portland General Electric Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1957 |
Transmission or distribution system owner | Portland General Electric Co |
Power and generating capacity | |
Number of units | 3 |
Total capacity from hydraulic turbine-generator units within each plant | 109.8 MW |
Average annual net hydropower generation | 414,690.0 MWH |
Download license summary for the Pelton Round Butte project.
Portland General Electric and Confederated Tribes of Warm Springs jointly own and operate the Pelton Round Butte Project which consists of three developments located on the Deschutes River, Crooked River, and Metolius River.
A Settlement was signed in 2004 between the licensee, agencies and Coalition members that governs the operation of the project.
The powerhouses for all three developments are integral with each of the three project dams.
The 247.12-MW Round Butte Development is the uppermost development and includes the 4,000-acre Lake Billy Chinook, the project’s largest storage reservoir. Lake Billy Chinook is located on the Deschutes, Metolius, and Crooked Rivers.
The dam for the 100.8-MW Pelton Development is located on the Deschutes River about 7 miles downstream from the Round Butte Dam. The 540-acre Pelton reservoir, known as Lake Simtustus, begins at the base of the Round Butte Dam.
The 18.9-MW Re-regulating Development is the most downstream development; its 190-acre reservoir on the Deschutes River extends from the tailwater of the Pelton Dam 2.5 miles downstream to the Re-regulating Dam.
Source: FERC License
Is there something you’d like to add or correct? Please let us know.
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition