AZ
Roosevelt
General information | |
Waterway |
Salt River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | Transferred |
Ownership and operation | |
Owner | Salt River Valley Water User's Association |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1973 |
Transmission or distribution system owner | Salt River Project |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 36.0 MW |
Average annual net hydropower generation | 69,049.3 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Whitewater 05/25/23
Grand Canyon Flow Management Delayed Again (AZ) - From American Rivers 07/20/22
I’m a River Guide and Water Lawyer. I’m Scared for the Grand Canyon. - From American Rivers 02/22/21
Colorado River Futures – “Climate & the River” Edition - From American Rivers 02/10/21
Future of the Colorado River – the “Changed River” edition - From American Rivers 02/02/21
New report confronts tough choices for the future of the Colorado River
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024