WA
Swift 2 P-2213
General information | |
Waterway |
Lewis River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2213 |
FERC project name | Swift No. 2 |
Permit issued | 6/21/08 |
Permit expiration | 5/27/58 |
Ownership and operation | |
Owner | PacifiCorp |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1958 |
Transmission or distribution system owner | PacifiCorp |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 72.0 MW |
Average annual net hydropower generation | 31,176.0 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Rivers 12/03/20
Bringing Back Lewis River Salmon
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024