Swift 2 P-2213

General information

Waterway  Lewis River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-2213
FERC project name Swift No. 2
Permit issued 6/21/08
Permit expiration 5/27/58

Ownership and operation

Owner PacifiCorp
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1958
Transmission or distribution system owner PacifiCorp

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 72.0 MW
Average annual net hydropower generation 31,176.0 MWH