CA
Thermalito P-2100
General information | |
| Waterway |
Feather River |
| Current status | Active license  |
| Type of facility | Conventional Hydro, Pumped Storage |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2100 |
| FERC project name | Feather River |
| Other projects with this FERC number | |
| Permit issued | 2/6/57 |
| Permit expiration | 1/27/07 |
Ownership and operation | |
| Owner | California Department of Water Resources |
| Owner type | State |
| Year first online (conventional hydro) | 1968 |
| Year first online (pumped storage) | 1968 |
| Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
| Number of units | 4 |
| Total capacity from hydraulic turbine-generator units within each plant | 32.6 MW |
| Average annual net hydropower generation | 185,390.4 MWH |
| Total capacity from pumped storage turbine-generator units | 82.5 MW |
| Pumped storage gross generation in megawatt hours for each powerplant | 13,979.9 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From Friends of the River 10/15/17
River Advocate – Volume 7, Issue 3 – October 2017
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

