Upper Baker P-2150

Upper Baker development- a powerhouse containing two turbine-generator units with a total installed capacity of 90.70 MW; downstream fish passage facilities; and appurtenant facilities. Lower Baker development- a powerhouse containing a single turbine-generator unit...

Lower Baker P-2150

Upper Baker development- a powerhouse containing two turbine-generator units with a total installed capacity of 90.70 MW; downstream fish passage facilities; and appurtenant facilities. Lower Baker development- a powerhouse containing a single turbine-generator unit...

Weiss Dam P-2146

Download license summary for the Coosa project. Alabama Power Company received an operating license for the Coosa River projects in June 2013 for the following seven developments: Weiss, H. Neely Henry (Neely Henry), Logan Martin, Lay, and Bouldin developments...

Wells P-2149

Wells Dam is located in Douglas County, WA, approximately 8 miles from the town of Pateros in the Mid-Columbia River. It is operated by the Douglas County PUD and was completed in 1969. The design of the project is unique because the generating units, spillways,...