Morony P-2188
General information | |
Waterway |
Missouri River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Reregulating |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2188 |
FERC project name | Missouri-Madison |
Other projects with this FERC number | |
Permit issued | 9/22/00 |
Permit expiration | 8/27/40 |
Ownership and operation | |
Owner | Northwestern Coporation |
Owner type | Wholesale Power Marketer |
Year first online (conventional hydro) | 1930 |
Transmission or distribution system owner | NorthWestern Energy LLC - (MT) |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 63.0 MW |
Average annual net hydropower generation | 258,126.8 MWH |
Download license summary for the Missouri-Madison projects.
The Missouri-Madison project consists of nine developments on the Madison and Missouri Rivers in Gallatin, Madison, Lewis and Clark, and Cascade Counties, in southwestern Montana.
The Missouri-Madison Hydroelectric Project develops hydropower on a 324-mile stretch of the Madison and Missouri Rivers.[1] The Madison River combines with the Gallatin and Jefferson Rivers[2] to form the Missouri River, which flows north toward the City of Great Falls, Montana. The Hebgen and Madison Developments are located on the Madison River. The other seven developments (Hauser, Holter, Black Eagle, Rainbow, Cochrane, Ryan, and Morony) are located on the Missouri River, downstream from the Bureau of Reclamation’s Canyon Ferry Hydroelectric Project. The last five developments are clustered near and downstream of the City of Great Falls. All nine developments have dams. Eight of the nine developments have power generating facilities, while the Hebgen Development is used as a storage facility.
[1]The nine developments are located between river miles 40 and 103 of the Madison River, and between river miles 2,105 and 2,237 of the Missouri River.
[2]These rivers were explored by Captains Meriwether Lewis and William Clark during their epic journey of 1804-1806. James Madison was at that time serving as Secretary of State in President Thomas Jefferson’s cabinet, while Albert Gallatin was Secretary of the Treasury.
Milestones
License Application Filed | 11-25-1992 |
FEIS Issued | 09-01-1999 |
License Issued | 09-27-2000 |
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From Idaho Rivers United 12/15/21
Myth of the Hydrosystem: the safety of dams - From Trout Unlimited 12/09/21
Update from the Madison River: Anglers rally to save trout - From Trout Unlimited 12/07/21
Are there “good” dams and “bad” dams? - From American Rivers 12/01/21
Update from the field: Montana dam malfunction impacts Madison River
News and updates
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From American Rivers9/9/2024