by Hydropower Reform Coalition | Mar 2, 2021
The Stillwater Hydroelectric Project is a run-of-river facility located on the Stillwater Branch of the Penobscot River in Old Town, Maine with a generating capacity of 1.95 MW. The Stillwater Project began commercial operations in 1913. The Stillwater Project’s...
by Hydropower Reform Coalition | Mar 2, 2021
The Newhalem Hydroelectric Project is located on the south bank of the Skagit River, in the town of Newhalem, WA. The project is within the Ross Lake National Recreation...
by Hydropower Reform Coalition | Mar 2, 2021
The Orono Hydroelectric Project is one of the three projects included in the the Penobscot River Restoration Agreement. The other two are: Stillwater Hydroelectric Project (P-2712) and Medway Hydroelectric Project (P-2666).
by Hydropower Reform Coalition | Mar 2, 2021
by Hydropower Reform Coalition | Mar 2, 2021