by Hydropower Reform Coalition | Mar 2, 2021
The 205-kilowatt (kW) project licensed in Dec 2012 will be located at Angelo dam on the La Crosse River in the Township of Angelo, Monroe County, Wisconsin. The dam is currently owned and operated by Monroe County. Angelo Dam consists of an earthen embankment with a...
by Hydropower Reform Coalition | Mar 2, 2021
This 450 kW project was licensed in Jan 2013 and will involve construction of a new dam 56-foot long and 14-foot high concrete diversion dam on the Gartina Creek near the Town of Hoonah, Alaska. The dam will create a 1.7 acre reservoir. Inside Passage Electric...
by Hydropower Reform Coalition | Mar 2, 2021
The 8-kilowatt (kW) project is located at the existing Rock River dam on the Rock River in Alger County, Michigan. The Rock River flows into the Lake Superior. The dam is located about 300 ft upstream of the Lake Superior. The dam was constructed in 1923 and is...
by Hydropower Reform Coalition | Mar 2, 2021
The Town of Afton, WY possesses the license for this 225 kW project to be located on the town’s existing Culinary Water Supply System near the town of Afton in Lincoln County, Wyoming. This project will be located entirely within the Bridger-Teton National...
by Hydropower Reform Coalition | Mar 2, 2021
The proposed project would be located at the existing Cedar Lake Dam, on the Cedar River, within the City of Nashua, Chickasaw County, Iowa. The proposed project would consist of: the existing 15.5-foot-high concrete gravity Cedar Lake Dam with a 258-foot-long...