by Hydropower Reform Coalition | Mar 2, 2021
The Snohomish County PUD No. 1 acquired this project in 2008 after the previous licensee had failed to commence contruction of the project.
by Hydropower Reform Coalition | Mar 2, 2021
The Norway-Oakdale Project consists of two developments: The upper development, Norway, includes a 915-foot-long dam and an integral powerhouse, equipped with four vertical Francis turbine-generating units with a total authorized installed capacity of 7.2 MW. The...
by Hydropower Reform Coalition | Mar 2, 2021
The Norway-Oakdale Project consists of two developments: The upper development, Norway, includes a 915-foot-long dam and an integral powerhouse, equipped with four vertical Francis turbine-generating units with a total authorized installed capacity of 7.2 MW. The...
by Hydropower Reform Coalition | Mar 2, 2021
The proposed project would be located at Lake Dorothy on Dorothy Creek, near Juneau, Alaska. The proposed project consists of: (1) the 1,138-acre Lake Dorothy and 305-acre Bart Lake; (2) a lake tap of Lake Dorothy to convey water to Bart Lake, located near the Lake...
by Hydropower Reform Coalition | Mar 2, 2021