Clearwater 1 P-1927

The North Umpqua Project was constructed between 1947 and 1956. It consists of a series of dams and canals that divert water to the eight developments, each of which has a powerhouse and a dam. The Clearwater No. 1 Development is the uppermost development on the...

Enloe

Enloe Dam was originally constructed as a wooden crib dam in 1906 and reconstructed as a concrete structure costing $125,000 in the early 1920s. Enloe Dam operated from about 1920 to 1959. When cheaper power became available in 1959, PUD staff at the time decided the...

Gile Flowage P-15055

The Gile Flowage development consists of the Gile Flowage reservoir and Gile Flowage dam. The facilities are owned and operated by Northern States and located entirely in Iron County, Wisconsin. The Gile Flowage dam, which impounds the reservoir, is located 20 miles...

Timothy Lake Powerhouse P-2195

Download License Summary for the Clackamas Project. The Clackamas River Project is located within the Clackamas River Basin. The Clackamas River drains more than 940 square miles as it flows west from the Cascade Mountain Range for 83 miles to its confluence with the...