Edward C Hyatt (Oroville) P-2100
General information | |
Waterway |
Feather River |
Current status | Active license, Dam failed  |
Type of facility | Conventional Hydro, Pumped Storage |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2100 |
FERC project name | Feather River |
Other projects with this FERC number | |
Permit issued | 2/6/57 |
Permit expiration | 1/27/07 |
Ownership and operation | |
Owner | California Department of Water Resources |
Owner type | State |
Year first online (conventional hydro) | 1968 |
Year first online (pumped storage) | 1968 |
Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
Number of units | 6 |
Total capacity from hydraulic turbine-generator units within each plant | 351.0 MW |
Average annual net hydropower generation | 1,476,167.7 MWH |
Total capacity from pumped storage turbine-generator units | 293.1 MW |
Pumped storage gross generation in megawatt hours for each powerplant | 88,946.9 MWH |
In 2017 the emergency spillway on the Oroville Dam failed, resulting in widespread evacuations and significant risk to downstream communities. The incident and lessons learned are described in detail in the Oroville Dam 2017 Spillway Incident report.
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Rivers 05/31/23
Dam Safety is Top Priority in California - From American Rivers 04/20/23
Dollars and Dams: Building Safety into California’s Future - From Friends of the River 08/10/22
Resolution of the Section 401 Clean Water Act cases and the FPA pre-emption case - From Friends of the River 10/15/17
River Advocate – Volume 7, Issue 3 – October 2017
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition